Yangtze River Cruise / IMG_5799 Close Window to Return

Previous Home Next

IMG_5799

Model of the dam (left), the ship elevator (centre) and the locks (right). The 14 turbines on the right side of the dam spillway are operational. The ones one the left will be added by 2009.